SAP ABAP Data Element PPH_MRP_PLMOD (Planning Mode for MRP Live)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP (Application Component) Material Requirements Planning
     PPH_MRP (Package) PP on HANA: MRP package
Basic Data
Data Element PPH_MRP_PLMOD
Short Description Planning Mode for MRP Live  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PPH_MRP_PLMOD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plg Mode 
Medium 15 Planning Mode 
Long 20 Planning Mode 
Heading 15 Planning Mode 
Documentation

Definition

Defines how the system is to process unfirmed procurement proposals from the last planning run in the new planning run.

You have two options to define the planning mode in MRP Live:

  • Planning Mode 1: Adapt Planning Data

    If the system finds an unfirmed procurement proposal that completely matches a requirement, it reuses this procurement proposal. If the system finds an unfirmed procurement proposal that only partially matches a requirement (for example, the quantity is correct but the date does not suit the requirement), the system deletes this unfirmed procurement proposal and creates a new one. The system explodes the BOM again for the recreated procurement proposals.

  • Planning Mode 3: Delete and Recreate Planning Data

    The system deletes all unfirmed procurement proposals and creates new procurement proposals to match the requirement situation.

Use

Dependencies

Example

History
Last changed by/on SAP  20131127 
SAP Release Created in