Hierarchy
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_MRP (Package) PP on HANA: MRP package
Basic Data
Data Element | PPH_MRP_PLMOD |
Short Description | Planning Mode for MRP Live |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PPH_MRP_PLMOD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plg Mode |
Medium | 15 | Planning Mode |
Long | 20 | Planning Mode |
Heading | 15 | Planning Mode |
Documentation
Definition
Defines how the system is to process unfirmed procurement proposals from the last planning run in the new planning run.
You have two options to define the planning mode in MRP Live:
- Planning Mode 1: Adapt Planning Data
If the system finds an unfirmed procurement proposal that completely matches a requirement, it reuses this procurement proposal. If the system finds an unfirmed procurement proposal that only partially matches a requirement (for example, the quantity is correct but the date does not suit the requirement), the system deletes this unfirmed procurement proposal and creates a new one. The system explodes the BOM again for the recreated procurement proposals.
- Planning Mode 3: Delete and Recreate Planning Data
The system deletes all unfirmed procurement proposals and creates new procurement proposals to match the requirement situation.
Use
Dependencies
Example
History
Last changed by/on | SAP | 20131127 |
SAP Release Created in |