SAP ABAP Data Element PPH_MRP_PLAN_IN_ABAP (Plan in Classic MRP)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-MRP (Application Component) Material Requirements Planning
⤷
PPH_ACCESS_HANA (Package) PP on HANA: Access to HANA objects

⤷

⤷

Basic Data
Data Element | PPH_MRP_PLAN_IN_ABAP |
Short Description | Plan in Classic MRP |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ClassicMRP |
Medium | 19 | Plan in Classic MRP |
Long | 26 | Always plan in classic MRP |
Heading | 26 | Always plan in classic MRP |
Documentation
Definition
Use
For every material planned in MRP Live, the system either calls classic MRP or MRP in HANA depending on the MRP parameters defined in the material master and in Customizing.
You select this checkbox if you want the system to call classic MRP instead of MRP in HANA to plan a material in a particular plant.
Dependencies
Example
You may want to force the system to execute the planning run using the classic MRP logic for a particular material to use a feature that is not yet available when planning with MRP in HANA, for example.
History
Last changed by/on | SAP | 20131127 |
SAP Release Created in |