SAP ABAP Data Element PPH_MRP_BOM_COMPONENTS (Include BOM Components in Planning)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_MRP (Package) PP on HANA: MRP package
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_MRP (Package) PP on HANA: MRP package
Basic Data
Data Element | PPH_MRP_BOM_COMPONENTS |
Short Description | Include BOM Components in Planning |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | BOM Comps |
Medium | 15 | BOM Components |
Long | 30 | BOM Components |
Heading | 30 | BOM Components |
Documentation
Definition
Controls whether you want to plan the BOM components during the planning run.
Use
Select this indicator if you want the system to plan the BOM components in addition to the materials selected in the Planning Scope section. In this case, the system only plans the BOM components for which the current planning run changed dependent requirements. Unchanged BOM components are not included in the planning run.
Note that the system also plans BOM components that are stored in plants that are not specified in the Planning Scope section.
Dependencies
Example
History
Last changed by/on | SAP | 20131127 |
SAP Release Created in | 616 |