SAP ABAP Data Element PPH_MAT_DISPLAY_IN_MRP_APPS (Material Displayed in MRP Apps)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-MRP (Application Component) Material Requirements Planning
⤷
PPH_MRP (Package) PP on HANA: MRP package
⤷
⤷
Basic Data
| Data Element | PPH_MAT_DISPLAY_IN_MRP_APPS |
| Short Description | Material Displayed in MRP Apps |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | PPH_MAT_DISPLAY_IN_MRP_APPS | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | MRP Apps |
| Medium | 15 | MRP Apps |
| Long | 30 | Material Displayed in MRP Apps |
| Heading | 30 | Material Displayed in MRP Apps |
Documentation
Definition
Specifies whether a material is displayed in the Apps for Material Requirements Planning (MRP).
Use
When accessing the Apps for MRP for the first time, the system automatically performs a check to determine whether a material can be displayed in the App.
The following entries exist:
- Initial - Material has not yet been checked
- G - The automatic check has determined that this material is displayed in the MRP Apps
- B - The automatic check has determined that this material is not displayed in the MRP Apps
- Y - User override: Material is to be displayed in MRP Apps
- N - User override: Material is not to be displayed in MRP Apps
From a technical point of view, all materials can be displayed in the Apps and, if necessary, you can use the settings Y and N to overrule the automatic system setting.
The system sets the entry B for materials that require features that are not supported by the Apps for MRP. Such features include:
- Total requirements
- Distribution key specified by production version
- Distribution key specified by component demand
- Incompatible forecast demand
- Outdated subcontracting logic
- Subdaily safety time
Dependencies
Example
History
| Last changed by/on | SAP | 20140121 |
| SAP Release Created in | 618 |