SAP ABAP Data Element PPE_SYNC_RP_OFFSET_TAKT (Interval in Takts bet. Synchronization RP and Start of Line)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEEXPLFLO (Package) Line Structure Explosion
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEEXPLFLO (Package) Line Structure Explosion
Basic Data
Data Element | PPE_SYNC_RP_OFFSET_TAKT |
Short Description | Interval in Takts bet. Synchronization RP and Start of Line |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | INT4 | |
Data Type | INT4 | 4-byte integer, integer number with sign |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sy.RP Int. |
Medium | 15 | Synch.RP Int. |
Long | 20 | Synch.RP Int. |
Heading | 13 | Synch.RP Int. |
Documentation
Definition
This field contains the number of takts between the start of the production line and the synchronization reporting point.
If the synchronization reporting point is at the end of a station, the corresponding takts are also included.
Example
A synchronization reporting point that is at the end of a station in takt 5, will have the value 5 in this field.
If the reporting point were at the start of the station, the interval would be 4 takts.
History
Last changed by/on | SAP | 20040316 |
SAP Release Created in | 46C2 |