SAP ABAP Data Element PPE_SEQTIME_MIN_ADD (Additional Minimum Interoperation Time)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT (Package) ACT-Specific iPPE Objects
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT (Package) ACT-Specific iPPE Objects
Basic Data
Data Element | PPE_SEQTIME_MIN_ADD |
Short Description | Additional Minimum Interoperation Time |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENG13V | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 18 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SEQTIME_MIN_ADD | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Min.Time 2 |
Medium | 20 | Min. Interop. Time 2 |
Long | 25 | Minimum Interop. Time 2 |
Heading | 25 | Minimum Interop. Time 2 |
Documentation
Definition
Specifies the minimum interoperation time. The interoperation time includes the following work elements:
- Move times from one activity to the next
- Wait times after the activity is executed
- Buffer times of the activity, such as the queue time
- Float before production and safety time for orders.
Use
The specified time must have expired before the next activity can begin.
Dependencies
If you are working with repetitive manufacturing, takt-based scheduling is executed in APO. The interoperation time is not considered.
The interoperation time is only planning-relevant for lead time scheduling. For configurable routing, scheduling problems can occur if not all activities of a process structure are selected due to the configuration.
History
Last changed by/on | SAP | 20040316 |
SAP Release Created in | 200 |