SAP ABAP Data Element PPE_CRTYPE_ADD (Additional Relationships)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷
AP-PPE (Application Component) Integrated Product and Process Engineering
⤷
CPPEACT (Package) ACT-Specific iPPE Objects
⤷
⤷
Basic Data
| Data Element | PPE_CRTYPE_ADD |
| Short Description | Additional Relationships |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | PPE_CRTYPE | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | CONSTRAINT_TYPE_ADD | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Relatshp 2 |
| Medium | 17 | Relationship 2 |
| Long | 35 | Relationship 2 |
| Heading | 35 | Relationship 2 |
Documentation
Definition
Defines the temporal relationship between two activities, that is, when the succeeding activity begins.
Use
You can choose from the following settings:
- Activity A and the succeeding activity B can begin at the same time.
- Activity A must be completed before you begin with activity B. The system applies this setting if no other setting has been selected.
- Activity A and the succeeding activity B can be completed at the same time. This means that activity A does not have to be completed when you begin with activity B.
- Succeeding activity B must first be completed.
Dependencies
This information is used for controlling lead time scheduling in APO.