SAP ABAP Data Element PPE_CHKID_ACT01 (General Structure Check)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPECHK (Package) Consistency Check of Production Version
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPECHK (Package) Consistency Check of Production Version
Basic Data
Data Element | PPE_CHKID_ACT01 |
Short Description | General Structure Check |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PPE_XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Gen. Check |
Medium | 19 | Gen. Struct. Check |
Long | 26 | General Structure Check |
Heading | 26 | General Structure Check |
Documentation
Definition
Checks for all routing types
- If at least one activity exists in the routing
- If an operation has at least one activity
- If an activity has at least one mode
- If routing objects are used multiple times in a routing.
Checks for routings and SNP routings
- If recursions occur in the relationships
- If all activities are connected to one another through relationships
- If redundancies occur when maintaining relationships between operations and activities in multi-level routings
- If scheduling data is complete
- If primary resources are specified that can be used in capacity requirements planning
- If the capacity requirements are complete
- If at least one mode of an activity can be automatically selected
- If different change statuses of a mode do not have the same valid-from dates.
Checks for routings
- If the linkage of modes using primary resources or mode ID is consistent for different change statuses at the mode
- If scrap and reporting points only exist at the last production activity below operations
- If only the first setup activity below an operation has a setup group or a setup key
- If the following was selected for individual relationships below an operation:
- Mode Linkage Using Primary Resources
- Continuous Load
- End-Start-Relationships
- If SA assignments are complete and unique
- If the object dependency is released
- If, for CTM planning, only end-start relationships and mode linkages using primary resources exist.
Checks for SNP routings
- If a maximum of one mode is maintained at the activity and no breaks are maintained for a CTM planning scenario.
Checks for CTM planning
- If all activities form a sequence
- If modes have the same change statuses
- If no setup group and setup key were maintained
- If no consumption times exist for the components
- If output exists at the last production activity only.
Use
Dependencies
Example
History
Last changed by/on | SAP | 20040316 |
SAP Release Created in | 200 |