SAP ABAP Data Element POC_PROC_STEP_QUALIFIER_COUNT (Determiner Activity for Count KPI)
Hierarchy
☛
SAP_BS_FND (Software Component) SAP Business Suite Foundation
⤷
CA-EPT-POC (Application Component) Process Orchestration for Built-In Processes
⤷
BS_POC_MAIN (Package) Process Orchestration - Runtime
⤷
⤷
Basic Data
| Data Element | POC_PROC_STEP_QUALIFIER_COUNT |
| Short Description | Determiner Activity for Count KPI |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | POC_PROC_STEP_QUALIFIER_COUNT | |
| Data Type | CHAR | Character String |
| Length | 2 | |
| Decimal Places | 0 | |
| Output Length | 2 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Determiner |
| Medium | 15 | Determiner |
| Long | 20 | Activity Determiner |
| Heading | 30 | Activity Determiner |
Documentation
Definition
An activity that determines how a count KPI is calculated.
Use
Determines the start of a count KPI calculation. You can specify whether the calculation should begin before or after the first or last occurrence of the given activity.
Example
Process A has five activities (A):
A1; A2; A3; A4; A5.
In process A, the activities occur in the following order:
A1 -> A2 -> A5 -> A4 -> A5 -> A4 -> A5
Process A has a KPI defined as follows: Count how many times A5 is executed after A4 is executed.
In this case, A5 is executed 2 times after A4.
History
| Last changed by/on | SAP | 20110908 |
| SAP Release Created in | 703 |