SAP ABAP Data Element PNPENDPS (End date of person selection period)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PA-PA (Application Component) Personnel Administration
     PBAS (Package) SAP HR Master Data Application Development
Basic Data
Data Element PNPENDPS
Short Description End date of person selection period  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PSP end 
Medium 15 PSP end date 
Long 35 End date of person selection period 
Heading 35 End date of person selection period 
Documentation

Definition

When you enter a person selection period, the system selects only those employees who are members of the enterprise on at least one day in the specified period. These are persons with a valid Organizational Assignment (0001) record. Entries in the standard selection options fields limit the personnel numbers that are selected. You can specify an interval by entering the start and end dates in the left and right columns respectively.

Procedure

The following reporting options are available:

  • The entire period
    If you make no entries, the system sets the lowest and highest system date as the start and end dates.
  • Partial periods
    You can specify an interval by making an entry in the left and right columns. If you enter only the highest date, the system automatically sets the lowest date.

Example

  • You have selected the 'Other period' radio button and made an entry only in the Person selection period field.


    Your evaluation should include all employees who have a valid Organizational Assignment (0001) record on at least one day from January to March 1995.
    Enter 01011995 as the Start date and 31031995 as the End date.

  • Make entries in one or more of the Organizational Assignment (0001) infotype fields.


    Your evaluation should include all employees who were assigned to personnel area "0001" on at least one day between January and March 1995.
    Also make an entry the Personnel area field.

Supplementary Documentation - PNPENDPS 0001

Use

Procedure

Use one of the following evaluation options:

  • Entire period
    If you do not make any entries, the earliest and latest system dates are automatically used as the start and end dates respectively.
  • Partial periods
    You can define the interval limits by making an entry in the left and right columns. If you only enter the upper limit in the right column, the earliest system date is automatically used as the lower limit.
  • Key date
    You can select records that are valid on a key date if you only enter a date in the left column.

Examples

Dependencies

History
Last changed by/on SAP  19940827 
SAP Release Created in