SAP ABAP Data Element PMGE_PSDUR (Possible Duration of the Checklist Item)
Hierarchy
EA-HRRXX (Software Component) Sub component EA-HRRXX of EA-HR
   PA-GE (Application Component) Management of Global Employees
     PAOC_PAD_MGE (Package) Management Of Global Employees
Basic Data
Data Element PMGE_PSDUR
Short Description Possible Duration of the Checklist Item  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUMC4    
Data Type NUMC   Character string with only digits 
Length 4    
Decimal Places 0    
Output Length 4    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Poss. Dur. 
Medium 15 Poss. Duration 
Long 20 Possible Duration 
Heading 39 Possible Duration of the Checklist Item 
Documentation

Definition

Refers to the timeframe within which the checklist item has to be rounded off.

This field is used in combination with the Time/Measurement Unit field.

History
Last changed by/on SAP  20020108 
SAP Release Created in 110