SAP ABAP Data Element PM_PRINT_INV (Positive or negative interval for invoicing printout)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BF-PS (Application Component) Portioning and scheduling
⤷
EE15 (Package) IS-U: Scheduling

⤷

⤷

Basic Data
Data Element | PM_PRINT_INV |
Short Description | Positive or negative interval for invoicing printout |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PLUSM | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 42 | Pos/Neg. Interval for Invoicing Printout |
Documentation
Use
Controls whether the interval for calculating the planned print date of invoicing is interpreted as a positive or negative interval.
Example
The start date is the end of the billing period and the target date is the planned print date of the invoice. The interval is interpreted to be negative.
The interval between the start date and the scheduled date was defined as four days. The scheduled date must be before the start date.
- If the start date falls on a Friday, the scheduled date is the previous Monday.
- If the start date falls on a Wednesday, the scheduled date is:
- The previous Saturday if you have not maintained a factory calendar
- The previous Thursday if you have maintained a factory calendar.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |