SAP ABAP Data Element PLAUE (Adopt schedule lines from previous planning dlv. sched.)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
Basic Data
Data Element | PLAUE |
Short Description | Adopt schedule lines from previous planning dlv. sched. |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Adopt old |
Medium | 15 | Adopt old PlDS |
Long | 20 | Adopt old plan DlvSc |
Heading | 1 | P |
Documentation
Definition
Indicates whether the system should adopt schedule lines from the previous planning delivery schedule when generating a new planning delivery schedule. This is relevant only for those schedule lines occuring after the validity end date of the delivery schedule split.
Use
With this indicator, you can set the system to keep schedule lines for future dates that you have already entered manually in the planning delivery schedule.
For further information, see the documentation on the delivery schedule split validity period.
History
Last changed by/on | SAP | 19970827 |
SAP Release Created in |