Hierarchy
⤷ FI-SL-SL (Application Component) Basic Functions
⤷ GPLN (Package) FI-SL planning
Basic Data
Data Element | PLANMANUAL |
Short Description | Ind.: Plan field group manually? |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Manually |
Medium | 15 | Plan manually |
Long | 20 | Plan FG manually |
Heading | 1 | M |
Documentation
Definition
This field indicates whether you can enter planned values manually for the field group during planning.
Supplementary Documentation - PLANMANUAL0001
Procedure
To plan costs in a foreign currency, you must cross off the relevant field in the planning parameters and enter a value in primary cost planning.
Use
If you cross off the relevant field in the planning parameters, the SAP System automatically calculates the costs in cost center currency, order currency,and controlling area currency. The costs are converted in the following order:
Costs in transaction currency -> costs in controlling area currency -> costs in cost center and order currency
Examples
Note
- You can only plan costs in a foreign currency if you specified in configuration with the "All currencies" indicator that these update the controlling area and fiscal year. You receive a warning message if this is not the case. If you ignore the warning, the planning parameters entered are used, but you can only plan the costs in the CO area currency.
- You should make sure that entries are defined in the exchange rate table for any exchange rates that may be needed.
Maintain Exchange Rates
- If an update in a particular foreign currency is allowed, you can display all the currency field groups irrespective whether these are planned manually or not.
Supplementary Documentation - PLANMANUAL0002
Procedure
If you want to plan costs in the cost center or order currency, you must flag this field.
Use
If this field is flagged, the system automatically calculates the costs in the controlling area currency.
However, if you also plan costs manually in the transaction currency, the system calculates the costs in the controlling area currency.
This does not apply if you calculate the costs manually in the controlling area currency.
If this field is not flagged, the system automatically calculates these costs from the costs in the controlling area currency.
Note
- You can only plan costs in a foreign currency if you specified in configuration with the "All currencies" indicator that these update the controlling area and fiscal year. You receive a warning message if this is not the case. If you ignore the warning, the planning parameters entered are used, but you can only plan the costs in the CO area currency.
- You should make sure that entries are defined in the exchange rate table for any exchange rates that may be needed.
Maintain Exchange Rates
- If an update in a particular foreign currency is allowed, you can display all the currency field groups irrespective whether these are planned manually or not.
Examples
Supplementary Documentation - PLANMANUAL0003
Procedure
To plan costs in the controlling area currency, you must cross off the relevent field in the planning parameters and enter a value in primary cost planning.
Use
If you activate the field in the planning parameters, the SAP System automatically calculates the costs in order currency and cost center currency.
If the field is not activated, the SAP System calculates the costs from the values in transaction currency, or in cost center or order currency, depending on which of the field groups is planned manually.
Examples
Note
- You can only plan costs in a foreign currency if you specified in configuration with the "All currencies" indicator that these update the controlling area and fiscal year. You receive a warning message if this is not the case. If you ignore the warning, the planning parameters entered are used, but you can only plan the costs in the CO area currency.
- You should make sure that entries are defined in the exchange rate table for any exchange rates that may be needed.
Maintain Exchange Rates
- If an update in a particular foreign currency is allowed, you can display all the currency field groups irrespective whether these are planned manually or not.
Supplementary Documentation - PLANMANUAL0004
Use
Field used to plan the consumption of a primary cost element for statistical use.
Procedure
If you want to plan consumption as well as costs on the cost elements, you must activate the relevant field in the planning parameters.
If the field is not activated, you cannot enter or change the plan consumption, but merely display it.
You can only enter the consumption when planning primary costs if the "Record quantity" indicator is crossed off in the master record of the primary cost element and a unit of measure is specified.
Examples
Note
Planning parameters which are not intended for planning consumption cannot be used with cost planning in product costing because all field groups are required there.
Supplementary Documentation - PLANMANUAL0005
Use
You can enter both planned and actual values for this field group; it is used to characterize cost centers.
You can use the values
- to form ratios in reporting (e.g. costs per employee), or
- as the basis for allocations (e.g assessment key).
Procedure
If you want to change or create the current value of statistical ratios during planning, you have to flag this field.
If you do not flag this field, you can still display this current value.
Examples
Note
Supplementary Documentation - PLANMANUAL0006
Use
You can only enter values for this field group during planning.
You can use the values
- to form ratios in reporting, or
- as a basis for allocations (e.g. assessment key).
Procedure
If you want to change or create the maximum value of statistical ratios, you have to flag this field.
If you do not flag this field, you can still display this maximum value.
Examples
Note
Supplementary Documentation - PLANMANUAL0007
Use
You can enter both planned and actual values for this field group; it is used to measure the output of a cost center.
The credit to the cost center is determined from the result of the planned or actual quantity multiplied by the current planned activity price.
Procedure
If you want to change or create the activity quantity during planning, you have to flag this field.
If you do not flag this field, you can still display this value.
Examples
Note
Supplementary Documentation - PLANMANUAL0008
Use
You can only enter values for this field group during planning; it describes the maximum possible output of a cost center when using all available resources.
Procedure
If you want to change or create the capacity of activities, you have to flag this field.
If you do not flag this field, you can still display the capacity.
Examples
Note
Supplementary Documentation - PLANMANUAL0009
Use
You can enter both planned and actual values for this field group; it is used to enter the output of a cost center using a different unit of measurement from that for the activity quantity.
You can determine this output either manually or automatically from the result of "activity quantity * output factor".
The output factor is defined in the activity master. You can overtype this default value when you first plan an activity on a cost center using the function "Edit" --> "Control data".
Procedure
If you want to change or create the output during planning, you have to flag this field.
If you do not flag this field, you can neither change nor display this value.
Examples
Activity "LATH01" describes the activity provided by lathe number 1 in the company. This lathe produces 35 pieces in one activity unit (e.g. 1 hour). The output factor is therefore 35. If the running time of the machine is 80 hours each month, the output would be:
80 hours * 35 pieces/hour = 2800 pieces.
Note
Supplementary Documentation - PLANMANUAL0010
Use
This field group is used to manually enter an activity price (political price) on a cost center. This value is stored in the cost center currency.
The credit to the cost center is determined from the planned or actual activity quantity multiplied by the current planned activity price.
Procedure
If you want to enter the activity prices manually, you have to flag this field.
If you do not flag this field, the value is automatically determined from the price in the controlling area currency, provided this is planned manually and the conditions for the update (see note) have been fulfilled. In this case, you can also display this value.
Examples
Note
The system only updates this field group if the indicator for updating all currencies is flagged for the relevant controlling area and fiscal year. If not, you can plan the activity prices in the controlling area currency only.
In activity allocation when determining the debits and credits, the price in the cost center currency is used in the first case and the price in the controlling area currency is used in the second case.
Supplementary Documentation - PLANMANUAL0011
Use
This field group is used to manually enter an activity price (political price) on a cost center. This value is stored in the controlling area currency.
The credit to the cost center is determined from the planned or actual activity quantity multiplied by the current planned activity price.
Procedure
If you want to enter the activity prices manually, you have to flag this field.
If you do not flag this field, the value is automatically determined from the price in the cost center currency, provided this is planned manually and the conditions for the update (see note) have been fulfilled. In this case, you can also display this value.
Examples
Note
The system only updates this field group if the indicator for updating all currencies is flagged for the relevant controlling area and fiscal
When determining the debits and credits in activity allocation, the price in the cost center currency is used in the first case and the price in the controlling area currency is used in the second case.
Supplementary Documentation - PLANMANUAL0012
Use
This field group is used to store the total quantity of the activity
used by cost centers or orders; you can enter either planned or actual
values for this field group.
The debit to the (receiver) cost center or the order is determined from the result of the planned or actual usage multiplied by the current
planned activity price. The sender cost center is credited with the
same amount.
Procedure
Examples
Dependencies
Supplementary Documentation - PLANMANUAL0019
Use
This field group is used to weight the activity types created on a cost center. The activity-independent costs on a cost center are distributed to the existing activity types according to this weighting.
Procedure
If you want to create or change the equivalence number in planning, you should check off this field.
If you do not check off this field, you can still display this value.
Examples
Dependencies
History
Last changed by/on | SAP | 19920610 |
SAP Release Created in |