SAP ABAP Data Element PLAN_TOTAL (Total or Average of Period Amounts)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   FI-SL-SL (Application Component) Basic Functions
     GPLN (Package) FI-SL planning
Basic Data
Data Element PLAN_TOTAL
Short Description Total or Average of Period Amounts  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV9    
Data Type CURR   Currency field, stored as DEC 
Length 17    
Decimal Places 2    
Output Length 23    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short Total 
Medium 20 Grand Total 
Long  
Heading  
Documentation

Definition

This field contains the accumulated total of all period values. The field group type determines whether this is a currency amount or a quantity or a weighting factor.

Supplementary Documentation - PLAN_TOTAL0001

Use

This field group is used to weight the activity types created on a cost center. The activity-independent costs planned on a cost center are assigned to the activity types based on this weighting.

Examples

You have planned the following activity types on cost center 4420:
ActType Planned qty Equiv.no.
------------------------------------------
PHR 400 hours 3
REP 50 hours 1
STP 20 hours 1
------------------------------------------
Total: 5
You have planned US$20,000 in activity-independent costs on this cost center. Activity price calculation assigns these activity-independent costs on the iteratively-calculated activity prices (cost rates) of the activity types as follows:
ActType Fixed costs Fixed portion of price
--------------------------------------------------------------
PHR 20,000 * 3/5 = 12,000 12,000 US$ : 400 hrs = 30 US$/hr
REP 20,000 * 1/5 = 4,000 4,000 US$ : 50 hrs = 80 US$/hr
STP 20,000 * 1/5 = 4,000 4,000 US$ : 20 hrs = 200 US$/hr

Supplementary Documentation - PLAN_TOTAL1001

Use

Planning

  • Activity input to receiver cost centers, orders, projects, or cost objects (product costing)
  • Activity quantities issued on sender cost centers

The plan/actual consumption multiplied by the activity price equals the debit to the receiver cost center or order and the equivalent credit to the sender cost center.

Procedure

You cannot change the "Plan manually" indicator in the CO activity input part of the planning parameters. In activity-input planning you can enter or change a value in this field group.

In the activity-dependent activity input part, you must cross off the relevant indicator if you want to enter or change the total consumption or fixed consumption manually.

If you do not cross off this indicator, you cannot plan any consumption, but only display existing consumption.

Examples

Note

You can post both plan and actual values to these field groups.

Dependencies

Supplementary Documentation - PLAN_TOTAL1002

Use

Field group used to store costs arising during internal activity allocation, to which both plan and actual values can be posted. The value is stored in sender cost center currency and is calculated from the plan/actual quantity multiplied by the internal activity price in sender cost center currency.

Procedure

This field group can be displayed only, provided the conditions stated in the note are met.

Examples

Dependencies

Note

This field group is only updated if the "Update all currencies" indicator is set for the relevant controlling area and fiscal year. If the indicator is not set, the costs can only be calculated in the controlling area currency.

Supplementary Documentation - PLAN_TOTAL1003

Use

Field group used to store plan and actual costs incurred during activity allocation. The values are translated from the controlling area currency and stored in the (receiver) cost center currency or order currency.

The SAP System uses the exchange rate type and the value date for the relevant version and current fiscal year for this calculation.

Procedure

This field group can only be displayed if the conditions stated in the note are met.

Examples

Dependencies

Note

This field group is only updated if the "Update all currencies" indicator is set for the relevant controlling area and fiscal year. If this indicator is not set, costs can only be calculated in controlling area currency.

Supplementary Documentation - PLAN_TOTAL1004

Use

Field group used to store costs arising from internal activity allocation. You can post both plan and actual values. The values are determined from the plan or actual quantity multiplied by the plan activity price. The SAP System stores the value in controlling area currency.

Procedure

The field group can be displayed at any time.

Examples

Dependencies

Note

If you have set the "Update all currencies" indicator for the relevant controlling area and fiscal year, the SAP System also calculates the costs in the (receiver) cost center currency or order currency. If this indicator is not set, the SAP System calculates the costs in controlling area currency only.

Supplementary Documentation - PLAN_TOTAL1005

Use

Field group used to plan the output of an activity on a cost center.

The debit for each activity on the cost center is the plan or actual quantity multiplied by the plan price for the activity.

Procedure

If you want to enter or change the plan activity quantity, you must cross off the "Plan manually" field in the planning parameters.

If the "Plan manually" field is not crossed off, the plan activity can only be displayed.

Examples

Note

This field group can be posted with both plan and actual values.

Supplementary Documentation - PLAN_TOTAL1006

Use

Field group used to plan the maximum possible output of a cost center making full use of all the available resources.

Procedure

If you want to enter or change the activity capacity in cost center planning, you must cross off the "Plan manually" field in the planning parameters.

If the "Plan manually" field is not crossed off, the plan activity capacity can only be displayed.

Examples

Note

This field group is only posted in planning.

Supplementary Documentation - PLAN_TOTAL1007

Use

Field group used to plan the output of an activity on a cost center in a unit of measure different from the activity quantity.

You can determine this output by multiplying the activity quantity by the output factor either manually or automatically by using the menu path Edit -> Calculate output.

The output factor is defined in the activity master. You can overwrite the default value when you first plan an activity on a cost center by using the menu path Edit -> Control data.

Procedure

If you want to create or change the planned output, you must cross off the "Plan manually" field in the planning parameters.

You can neither change nor display the output if the "Plan manually" field is not crossed off.

Examples

"TURN01" is the name of the activity performed on lathe No. 1 in the factory. This lathe produces 35 pieces within one hour. The output factor is thus 35. If the machine runs for 80 hours a month, the output equals

80 hours * 35 pieces/hour = 2800 pieces.

Note

This field group can be posted with both plan and actual values.

Supplementary Documentation - PLAN_TOTAL1008

Use

Field group used to display and store the complete activity consumption used by other CO objects (such as cost centers) in activity input planning.

Procedure

To display the scheduled activity on the first screen in cost center planning, you must cross off the "First display in entry screen" field in the planning parameters.

If you do not cross off this field, the scheduled activity is displayed on a screen after the initial entry screen.

Examples

Note

The scheduled activity cannot be planned or changed manually in activity planning.

Supplementary Documentation - PLAN_TOTAL1009

Use

This field group is used to weight the activity types created on a cost center. The activity-independent costs planned on a cost center are assigned to the activity types based on this weighting.

Examples

You have planned the following activity types on cost center 4420:
ActType Planned qty Equiv.no.
------------------------------------------
PHR 400 hours 3
REP 50 hours 1
STP 20 hours 1
------------------------------------------
Total: 5
You have planned US$20,000 in activity-independent costs on this cost center. Activity price calculation assigns these activity-independent costs on the iteratively-calculated activity prices (cost rates) of the activity types as follows:
ActType Fixed costs Fixed portion of price
--------------------------------------------------------------
PHR 20,000 * 3/5 = 12,000 12,000 US$ : 400 hrs = 30 US$/hr
REP 20,000 * 1/5 = 4,000 4,000 US$ : 50 hrs = 80 US$/hr
STP 20,000 * 1/5 = 4,000 4,000 US$ : 20 hrs = 200 US$/hr

Supplementary Documentation - PLAN_TOTAL1010

Use

Field group used to set manually the total (fixed + variable) or fixed internal price of an activity on a cost center. The SAP System stores this value in cost center currency.

The credit to the cost center is derived from the plan or actual quantities taken by other cost centers multiplied by the plan activity price.

Procedure

To set the activity prices manually, you must

  • cross off the relevant field in the planning parameters
  • set the activity price to "3" with the menu path Activity price -> Edit -> Control data
  • assign a realistic value to the activity price

If you do not cross off the field in the planning parameters, the SAP System automatically calculates the activity price in cost center currency using the controlling area currency, provided the required conditions are met (see note). In this case, the activity price is displayed in controlling area currency, but cannot be changed manually.

Examples

Note

This field group is only updated if the "Update all currencies" indicator is active for the relevant controlling area and fiscal year. If the indicator is not active, you can only plan activity prices in controlling area currency.

If the indicator is active, the activity price in cost center currency is used to calculate the debits and credits in cost allocations. If the indicator is not active, the activity price in controlling area currency is used instead.

Supplementary Documentation - PLAN_TOTAL1011

Use

Field group used to set manually the total (fixed + variable) or fixed internal activity price on a cost center in controlling area currency.

The plan/actual quantities taken by other cost centers multiplied by the plan activity price equals the credit to the cost center.

Procedure

To set the activity prices manually, you must

  • cross off the relevant field in the planning parameters,
  • set the activity price indicator to "3" using the menu path Activity types -> Edit -> Control data.
  • Enter a realistic value for the activity price in planning.

If you do not set the indicator, the SAP System automatically calculatesthe activity price in controlling area currency based on the price in cost center currency provided the conditions for updating all currencies are met (see note). In this case, the activity price is displayed in controlling area currency and cannot be changed manually.

Examples

Note

This field group is updated if the "Update all currencies" indicator is set for the relevant controlling area and fiscal year. If the indicator is not set, you can only plan activity prices in controlling area currency.

If the indicator is set, the activity price in cost center currency is used to calculate credits and debits for cost allocations. Otherwise the activity price in controlling area currency is used.

Supplementary Documentation - PLAN_TOTAL1012

Use

The plan activity quantity multiplied by the fixed activity price in cost center currency equals the plan fixed credit in cost center currency.

Procedure

If you want to display the plan credit in cost center currency in the first planning screen, you must activate this field group in the planning parameters.

If you do not activate this field group, the plan credit will be displayed on one of the subsequent screens, provided the conditions for updating currencies are met (see note).

Note

This field group can only be displayed if the "Update all currencies" indicator is activated for the fiscal year in the controlling area control data. If this is not the case, the plan credit is only displayed in controlling area currency.

The plan credit is calculated by the SAP System. The field cannot be changed in planning.

Supplementary Documentation - PLAN_TOTAL1013

Use

The plan activity quantity multiplied by the fixed activity price equals the cost center plan credit in controlling area currency.

Procedure

If you want to display the plan credit in controlling area currency on the first planning screen, you must activate this field group in the planning parameters.

If you do not activate the plan credit field group in the planning parameters, it is shown in one of the subsequent screens.

Note

The plan credit is calculated automatically by the SAP System. This field group cannot be changed in planning.

Supplementary Documentation - PLAN_TOTAL1014

Procedure

To plan costs in a foreign currency, you must cross off the relevant field in the planning parameters and enter a value in primary cost planning.

Use

If you cross off the relevant field in the planning parameters, the SAP System automatically calculates the costs in cost center currency, order currency,and controlling area currency. The costs are converted in the following order:

Costs in transaction currency -> costs in controlling area currency -> costs in cost center and order currency

Examples

Note

  • You can only plan costs in a foreign currency if you specified in configuration with the "All currencies" indicator that these update the controlling area and fiscal year. You receive a warning message if this is not the case. If you ignore the warning, the planning parameters entered are used, but you can only plan the costs in the CO area currency.
  • You should make sure that entries are defined in the exchange rate table for any exchange rates that may be needed.

    Maintain Exchange Rates

  • If an update in a particular foreign currency is allowed, you can display all the currency field groups irrespective whether these are planned manually or not.

Supplementary Documentation - PLAN_TOTAL1015

Procedure

To plan costs in the cost center currency or order currency, you must cross off the relevant field in the planning parameters and enter a value in primary cost planning.

Use

If you do not cross off the field, the SAP System calculates the costs in the controlling area currency.
If you also want to plan the costs in transaction currency, the system calculates the costs in the controlling area currency from the values in transaction currency.
The costs are not converted if the costs are also planned manually in controlling area currency.

If the field is not crossed off in the planning parameters, the SAP System automatically calculates the costs in the cost center currency from the values in controlling area currency.

Note

  • You can only plan costs in a foreign currency if you specified in configuration with the "All currencies" indicator that these update the controlling area and fiscal year. You receive a warning message if this is not the case. If you ignore the warning, the planning parameters entered are used, but you can only plan the costs in the CO area currency.
  • You should make sure that entries are defined in the exchange rate table for any exchange rates that may be needed.

    Maintain Exchange Rates

  • If an update in a particular foreign currency is allowed, you can display all the currency field groups irrespective whether these are planned manually or not.

Examples

Supplementary Documentation - PLAN_TOTAL1016

Procedure

To plan costs in the controlling area currency, you must cross off the relevent field in the planning parameters and enter a value in primary cost planning.

Use

If you activate the field in the planning parameters, the SAP System automatically calculates the costs in order currency and cost center currency.

If the field is not activated, the SAP System calculates the costs from the values in transaction currency, or in cost center or order currency, depending on which of the field groups is planned manually.

Examples

Note

  • You can only plan costs in a foreign currency if you specified in configuration with the "All currencies" indicator that these update the controlling area and fiscal year. You receive a warning message if this is not the case. If you ignore the warning, the planning parameters entered are used, but you can only plan the costs in the CO area currency.
  • You should make sure that entries are defined in the exchange rate table for any exchange rates that may be needed.

    Maintain Exchange Rates

  • If an update in a particular foreign currency is allowed, you can display all the currency field groups irrespective whether these are planned manually or not.

Supplementary Documentation - PLAN_TOTAL1017

Use

Field used to plan the consumption of a primary cost element for statistical use.

Procedure

If you want to plan consumption as well as costs on the cost elements, you must activate the relevant field in the planning parameters.

If the field is not activated, you cannot enter or change the plan consumption, but merely display it.

You can only enter the consumption when planning primary costs if the "Record quantity" indicator is crossed off in the master record of the primary cost element and a unit of measure is specified.

Examples

Note

Planning parameters which are not intended for planning consumption cannot be used with cost planning in product costing because all field groups are required there.

Supplementary Documentation - PLAN_TOTAL1018

Use

Feld used to describe the values on a cost center.

Use these values

  • to set up key figures in reporting (such as costs for each employee)
  • as a basis for allocations

Procedure

if you want to enter or change the current value of statistical key figures, cross off the relevant field in the planning parameters.

If you do not cross off this field, you cannot plan or change the current value, but only display existing values.

Examples

Note

You can enter both plan and actual values for this field group.

Supplementary Documentation - PLAN_TOTAL1019

Use

Field used to describe the values on a cost center.

Use these values

  • to set up key figures in reporting (such as costs for each employee)
  • as a basis for allocations

Procedure

If you want to enter or change the maximum value of statistical key figures, cross off the relevant field in the planning parameters.

If you do not cross off this field, you cannot plan or change the maximum value, but only display existing values.

Examples

Note

This field group can only be used in plan. You cannot enter actual data.

History
Last changed by/on SAP  20100310 
SAP Release Created in