SAP ABAP Data Element PL_PLPNR (Production lot number)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ MD07 (Package) Production lot planning
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ MD07 (Package) Production lot planning
Basic Data
Data Element | PL_PLPNR |
Short Description | Production lot number |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PS_POSID | |
Data Type | CHAR | Character String |
Length | 24 | |
Decimal Places | 0 | |
Output Length | 24 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | PLP | |
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PLP no. |
Medium | 15 | Production lot |
Long | 20 | Production lot no. |
Heading | 24 | PLP No. |
Documentation
Definition
Alphanumeric key, which clearly identifies the production lot of an assembly.
Use
You can create a separate BOM and a separate routing for this production lot.
Using this number, you plan and produce the production lot of an assembly and you can calculate the planned and actual costs of the assembly production.
If the manufacturing process of an assembly changes, you create a new production lot number and carry out planning and production with the new number, as well as planned and actual cost determination. This allows you to determine the costs of different manufacturing processes separately and then compare them.
Dependencies
When you create the production lot, the system creates a WBS element.
Procedure
Enter the production lot number.
History
Last changed by/on | SAP | 20010221 |
SAP Release Created in |