SAP ABAP Data Element PIDLZ (Planned/actual lead time deviation)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-IS (Application Component) Information System
     MCF (Package) R/3 application development: Shop Floor Information System
Basic Data
Data Element PIDLZ
Short Description Planned/actual lead time deviation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DAUER_6_1V    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 7    
Decimal Places 1    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 P/A LdTmDv 
Medium 15 P/A lead tm.dv. 
Long 20 P/A lead time dev. 
Heading P/ALdTDv 
Documentation

Definition

The average planned/actual lead time variance is calculated as follows:

average planned/actual lead time variance =

average planned/actual lead time variance - average actual lead time variance

The lead time of the order begins with the start date and ends with the delivery date. For calculation purposes only the plant calendar days are considered.

The planned lead time is the difference between the basic dates of start and finish; start and delivery dates are also included.

A lead time variance with a negative sign shows that the actual process of the production order lasted longer than was shown in the plan. A positive sign shows that the actual lead time was shorter than the planned lead time.

Use

In the standard of the Shop Floor Information System this key figure is determined by executing the production order and material analysis and is then updated in the information structures S021 and S023.