SAP ABAP Data Element PID_SMAT (Total for material - planning ID)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
Basic Data
Data Element | PID_SMAT |
Short Description | Total for material - planning ID |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 1 | a |
Medium | 1 | a |
Long | 1 | a |
Heading | 1 | a |
Documentation
Definition
You accessed the planning table by entering a planning ID.
In this line, the system displays the sum of all planned order quantities and production order quantities for a material. The sum is made up of the quantities of each production version and therefore, the individual run schedule headers for the material.
If you only entered one planning ID when entering the Transaction, then the individual version of this material must be assigned to this planning ID. If you specified both planning IDs then all versions must be assigned to both planning IDs.
If you select the same field with F2 again, the system displays detailed information on all the individual lines which make up the totals line.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in |