SAP ABAP Data Element PHIN_D_RECENT_MATNR (Material Number Used During Last Takeover)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ PM-EQM-THO (Application Component) Takeover/Handover of Technical Objects
⤷ PHIN (Package) Takeover/Handover of Technical Objects
⤷ PM-EQM-THO (Application Component) Takeover/Handover of Technical Objects
⤷ PHIN (Package) Takeover/Handover of Technical Objects
Basic Data
Data Element | PHIN_D_RECENT_MATNR |
Short Description | Material Number Used During Last Takeover |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR40 | |
Data Type | CHAR | Character String |
Length | 40 | |
Decimal Places | 0 | |
Output Length | 40 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Recent Mat |
Medium | 20 | Recent Material |
Long | 30 | Recent Material Number |
Heading | 40 | Recent Material Number |
Documentation
Definition
Material number used by business partners during handover (takeover in your system).
Use
Although there may be a material change ('material upgrade') in your system, the material number the business partner used during the last handover contains the information about how the business partner identified the material when performing handover. This information is sent back at last with handover to the business partner to help identify the material.
Dependencies
Example
Business Partner named Material 'A1'.
In the own system this material is named 'OUR1'.
Then a material change to 'OUR2' is performed.
The recent material number is 'A1'.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 605 |