SAP ABAP Data Element PHIN_D_PO_MPL (Activity: Deactivate Maintenance Plans)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ PM-EQM-THO (Application Component) Takeover/Handover of Technical Objects
⤷ PHIN (Package) Takeover/Handover of Technical Objects
⤷ PM-EQM-THO (Application Component) Takeover/Handover of Technical Objects
⤷ PHIN (Package) Takeover/Handover of Technical Objects
Basic Data
Data Element | PHIN_D_PO_MPL |
Short Description | Activity: Deactivate Maintenance Plans |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Deact. MP |
Medium | 19 | Deact. Maint. Plans |
Long | 30 | Deactivate Maintenance Plans |
Heading | 40 | Activity: Deactivate Maintenance Plans |
Documentation
Definition
If this flag is switched on, the maintenance plans for the technical objects are deactivated in the background during handover. If you deactivate a maintenance plan, it can no longer be scheduled. This means that the system does not generate any maintenance calls or maintenance call objects for this maintenance plan.
Use
Dependencies
Example
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 700 |