Hierarchy

⤷

⤷

Basic Data
Data Element | PERIODEDAY |
Short Description | Period length in days |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PRIODEY | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Days |
Medium | 15 | Days |
Long | 20 | Days |
Heading | 4 | Days |
Documentation
Use
Determines the interval in which the corresponding contracts are billed.
Dependencies
If you enter the period length in days, the system includes only two of the meter reading dates on the meter reading list in the meter reading unit.
Example
- Days: 50
- End of billing period: 03/31/1998
If you generate the portion schedule records for 1998, valid until the end of 1998, the dates for the end of the billing period are: 03/31/1998, 05/20/1998, 07/09/1998,08/28/1998, 10/17/1998 and 12/06/1998.
If you select the field Include FactClr (take factory calendar into account), the days are calculated as 50 workdays. To do this you must maintain a factory calendar.
- Days: 50
- End of billing period: 03/31/1998
- Incl FactClr X
If you generate the portion schedule records for 1998, valid until the end of 1998, the dates for the end of the billing period are: 03/31/1998, 06/17/1998, 08/26/1998, 11/04/1998, 01/19/1998.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |