SAP ABAP Data Element PERCA (Calendar used to determine dates)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
Basic Data
Data Element | PERCA |
Short Description | Calendar used to determine dates |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WFCID | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table | TFACD |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Cal.ID |
Medium | 15 | Calendar ID |
Long | 20 | Calendar ID |
Heading | 3 | ID |
Documentation
Use
Enter a calendar ID in this field to influence the date calculated by the system during indirect date determination.
Example
The system calculates the end date for a maintenance contract for a photocopier on the basis of the following criteria:
Date rule : Installation date plus one year
Baseline date : Installation date
Time period : One year
Calendar ID : Month's end
The installation date is 02.15.1995.
The contract end date on the basis of the date rule is 02.15.96.
However, by taking the calendar into account, the system moves the contract end date to the end of the month (02.29.1996).
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |