SAP ABAP Data Element PDE_PBS_VLTSV_P10_BERECH_DATE (Calculation Date)
Hierarchy
☛
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
⤷ PY-DE-PS-VA (Application Component) Pension Administration
⤷ P01PBSVAVG_DDIC (Package) HR-VADM: Public Sector Pensions Act (DDIC, User Interface)
⤷ PY-DE-PS-VA (Application Component) Pension Administration
⤷ P01PBSVAVG_DDIC (Package) HR-VADM: Public Sector Pensions Act (DDIC, User Interface)
Basic Data
Data Element | PDE_PBS_VLTSV_P10_BERECH_DATE |
Short Description | Calculation Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATS | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Key Date |
Medium | 15 | Calculatn Date |
Long | 20 | Calculation Date |
Heading | 20 | Calculation Date |
Documentation
Definition
You use this date to specify the in-period for internally calling the report RPLEROD0 (Evaluation of Pension Payment Reimbursements). The report RPLEROD0 is called to calculate the stipulated reimbursement amount for the reimbursement year 2010. You can use the parameter Calculation Date, which is not contained on the selection screen of RPLEROD0, to include in the evaluation all changes that had an effect retroactively in 2010. This date is used as the in-period for the evaluation of the payroll results. In this way, you obtain the current reimbursement amount. The field is predefined with the current date.
Use
Dependencies
Example
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |