SAP ABAP Data Element PCON_PNODE (Name of Concept Group)
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPECON (Package) iPPE Application Object CON - Solution Concepts
Basic Data
Data Element PCON_PNODE
Short Description Name of Concept Group  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PVS_PNODE    
Data Type CHAR   Character String 
Length 40    
Decimal Places 0    
Output Length 40    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID PND  
Default Component name NODE_NAME   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Object 
Medium 15 iPPE Object 
Long 15 iPPE Object 
Heading 15 iPPE Object 
Documentation

Definition

Describes a concept group.

Use

Dependencies

Example

Supplementary Documentation - PCON_PNODE0001

Use

When you assign a PVS node to an activity, you state that the components represented by that PVS node are to be installed in that activity.

Dependencies

If all the variants of the PVS node are to be installed in this activity, you enter only the PVS node.

If only some of the variants of the PVS node are to be installed in this activity, you must enter these variants in addition to the PVS node in the Variant field.

You can also assign production resources/tools to an activity. However, you can do so only if you have maintained PVS nodes for the production resources/tools.

Example

Supplementary Documentation - PCON_PNODE0002

Use

  • In the BOM field, you can enter the access node or a structure node from the product structure for which you wish to display the BOM data. If you use a production version to access the display, the product structure is taken automatically from the iPPE access object for that production version.
  • In the Routing field, you can enter a routing header or a grouping node from the process structure for which you wish to display the routing data. If you use a production version to enter the display, the process structure is taken automatically from the iPPE access object for that production version.

Dependencies

Example

Supplementary Documentation - PCON_PNODE0003

Use

The primary resource is the iPPE object production resource. You must enter a production resource in order to enter the duration. When the production resource is a worker and indicated as relevant for capacity planning, it also forms the basis for the connection to Product Cost Planning and Labor Ressource Planning in the SAP APO.

Dependencies

In the mode, you can enter more production resources as secondary resources. However, these are not considered for capacity planning in the SAP APO. This allows you, for instance, to assign production resources/tools as secondary resources.

When iPPE data is transferred to the SAP APO, the system generates APO resources for the production resources in the SAP APO.

Example

Supplementary Documentation - PCON_PNODE0004

Use

You can enter a production resource that is not intended for capacity planning in the SAP APO, for instance, a production resource or tool.

Dependencies

Example

History
Last changed by/on SAP  20040316 
SAP Release Created in 110