SAP ABAP Data Element PC_CHANGE (Adjust Budget Billing Plan to Portion)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-IN (Application Component) Invoicing
     EE25 (Package) IS-U: Budget Billing Amounts
Basic Data
Data Element PC_CHANGE
Short Description Adjust Budget Billing Plan to Portion  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KENNZX    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Adj.to Po. 
Medium 15 Adj. to Portion 
Long 20 Adjust to Portion 
Heading BB 
Documentation

Definition

Adjustment to Current Date Data

Use

Specifies whether a selected budget billing plan is adjusted to the current portion.

This is necessary after changing the end of the billing period in the maste record of the portion.

Dependencies

The system does not check whether a portion change has taken place.

It is determined internally whether new budget billing plans must be create. It is not possible to make an entry in the Do Not Create NewBudget Billing plans field.

The change date, in this case, does not specify when the budget billing plan is prorated. The budget billing is not changed.

Example

History
Last changed by/on SAP  20050224 
SAP Release Created in 463