SAP ABAP Data Element PC_CHANGE (Adjust Budget Billing Plan to Portion)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-IN (Application Component) Invoicing
⤷ EE25 (Package) IS-U: Budget Billing Amounts
⤷ IS-U-IN (Application Component) Invoicing
⤷ EE25 (Package) IS-U: Budget Billing Amounts
Basic Data
Data Element | PC_CHANGE |
Short Description | Adjust Budget Billing Plan to Portion |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KENNZX | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Adj.to Po. |
Medium | 15 | Adj. to Portion |
Long | 20 | Adjust to Portion |
Heading | 2 | BB |
Documentation
Definition
Adjustment to Current Date Data
Use
Specifies whether a selected budget billing plan is adjusted to the current portion.
This is necessary after changing the end of the billing period in the maste record of the portion.
Dependencies
The system does not check whether a portion change has taken place.
It is determined internally whether new budget billing plans must be create. It is not possible to make an entry in the Do Not Create NewBudget Billing plans field.
The change date, in this case, does not specify when the budget billing plan is prorated. The budget billing is not changed.
Example
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 463 |