SAP ABAP Data Element PC_ABDATUM (Date for Billing Data Change)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-IN (Application Component) Invoicing
⤷
EE25 (Package) IS-U: Budget Billing Amounts
⤷
⤷
Basic Data
| Data Element | PC_ABDATUM |
| Short Description | Date for Billing Data Change |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DATUM | |
| Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
| Length | 8 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ABDATUM | |
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Chnge date |
| Medium | 15 | Change date |
| Long | 20 | Change date |
| Heading | 2 | CD |
Documentation
Definition
Earliest date for proration of a budget billing period.
Use
All selected budget billing plans are prorated on this date at the very earliest.
A shift forward in the proration date occurs for due dates which are:
- Before the period for general terms of utility service
- Partially paid
- Printed
- Requested in the collective bill
- Included in an installment plan
- Deferred
- Stopped due to a move out/in
- Inactive due to an installation disconnection
History
| Last changed by/on | SAP | 20050224 |
| SAP Release Created in | 462 |