SAP ABAP Data Element PC03_PROD_X (Database update for periods not yet generated)
Hierarchy
☛
SAP_HRCAT (Software Component) Sub component SAP_HRCAT of SAP_HR
⤷
PY-AT (Application Component) Austria
⤷
PC03 (Package) HR Payroll: Austria

⤷

⤷

Basic Data
Data Element | PC03_PROD_X |
Short Description | Database update for periods not yet generated |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 0 |
Documentation
Definition
If the indicator is set, the report only generates the periods for which no personal calendar was generated. If you enter a data selection period that includes the previously generated time periods, these periods are ingored in the report.
Periods that have not yet been generated are behind the date that is stored in the infotype payroll status (0003) in the field Pers. calendar from
Procedure
Examples
Dependencies
The date from which an employee's personal calendar must be generated is stored in the infotype payroll status (0003) in the field Pers. calendar from
History
Last changed by/on | SAP | 19980505 |
SAP Release Created in |