SAP ABAP Data Element PC03_DELAY (Include Days Off Work)
Hierarchy
☛
SAP_HRCAT (Software Component) Sub component SAP_HRCAT of SAP_HR
⤷ PY-AT (Application Component) Austria
⤷ PC03 (Package) HR Payroll: Austria
⤷ PY-AT (Application Component) Austria
⤷ PC03 (Package) HR Payroll: Austria
Basic Data
Data Element | PC03_DELAY |
Short Description | Include Days Off Work |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 0 |
Documentation
Definition
If the indicator is set, the report regards the non-working days that occur immediately prior to the sought absence symbol as if they also bore the sought absence symbol.
Note
When an employee's maximum period of entitlement to continued pay from the employer has been used up, sickpay is guarenteed from the next calendar day. According to SozSi 10/74, this also applies if the next day is a non-working day (for example, a Saturday). A day of this kind is identified with a note in the list.
History
Last changed by/on | SAP | 19980505 |
SAP Release Created in |