SAP ABAP Data Element PBR_PREA3 (Notice period start date)
Hierarchy
☛
SAP_HRCBR (Software Component) Sub component SAP_HRCBR of SAP_HR
⤷
PA-PA-BR (Application Component) Brazil
⤷
PB37 (Package) HR master data: Brazil

⤷

⤷

Basic Data
Data Element | PBR_PREA3 |
Short Description | Notice period start date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | NotPerStrt |
Medium | 15 | Not.per.start |
Long | 20 | Notice period start |
Heading | 13 | Not.per.start |
Documentation
Definition
The specifies the start date of notice period. The system calculates the difference between the date specified and the termination date (validity date of infotype Termination - IT0661) to take working days into account. This date can also be used to start an update or change dynamic action in the infotype Contract elements (IT0008), in order to highlight basic pay for notice period days.
History
Last changed by/on | SAP | 20010820 |
SAP Release Created in | 46C |