SAP ABAP Data Element PAY_CUM_RELDT (Period date relevant for cumulations)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PY-XX (Application Component) Payroll: General Parts
     PCAL (Package) SAP HR Payroll Application Development
Basic Data
Data Element PAY_CUM_RELDT
Short Description Period date relevant for cumulations  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DTUSE    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Cum.date 
Medium 20 Rel.date for cumltns 
Long 30 Relevant date for cumulations 
Heading 15 Relevant date 
Documentation

Definition

Specifies the date in a payroll period (payday, start date or end date) which determines the assignment to a cumulation interval.

Use

Dependencies

Example

You use weekly payroll periods in your system. The period 17 2000 starts on 24 April and ends on 30 April. The payday for this payroll period is 03 May. Ths system can assign this period to different monthly cumulation intervals:

  • Depending on the start or end date it is assigned to the month April.
  • Depending on the payday it is assigned to the month May.

History
Last changed by/on SAP  20000131 
SAP Release Created in