Hierarchy
⤷ PY-NO-PS (Application Component) Public Sector
⤷ P20P_PA (Package) Norway - Public Sector, Master Data & PA
Basic Data
Data Element | P20P_SENIOR |
Short Description | Seniority Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATS | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sen. Date |
Medium | 15 | Seniority Date |
Long | 20 | Seniority Date |
Heading | 14 | Seniority Date |
Documentation
Definition
This date determines the seniority of the employee. You can overwrite the default date.
If you have maintained the Date Type, VS (Seniority Date) in Date Specifications infotype (0041), the system reads this as the default date. Else, the system reads the hire date of the employee as the default date.
Use
Whenever you create or update the Activity with Higher Rate of Pay infotype (0509) record, the system uses this date to calculate the seniority of the employee. This seniority is calculated to determine the Pay Scale Level of the employee, which in turn is used to calculate the salary of the employee for the Additional Position.
The Pay Scale Reclassification acc. to Age or pay Scale Membership Period report (RPITUMVP) also reads this date to calculate the seniority of the employee.
Dependencies
Example
The employee was hired on 01.04.2001
For the Date Type, VS (Seniority Date) in Date Specifications infotype (0041), you have maintained the date as April 1, 2000.
When you create the Activity with Higher Rate of Pay infotype (0509) record for the employee, the default date for the Seniority Date field will be the date that you have maintained in Date Specifications infotype (0041) for the Date Type, VS, which is, April 1, 2000.
You then overwrite this date with December 1, 1999.
If you are creating the Activity with Higher Rate of Pay infotype (0509) record, which is valid fromDecember 1, 2003, the system will calculate the seniority of the employee as the difference between December 1, 2003 and December 1, 1999.
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in | 46C |