SAP ABAP Data Element P08_APPSE (Earliest start date for adoption pay period)
Hierarchy
☛
SAP_HRCGB (Software Component) Sub component SAP_HRCGB of SAP_HR
⤷
PA-PA-GB (Application Component) Great Britain
⤷
PB08 (Package) HR master data: UK

⤷

⤷

Basic Data
Data Element | P08_APPSE |
Short Description | Earliest start date for adoption pay period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Earl.APP |
Medium | 15 | Earl.start APP |
Long | 20 | Earliest start APP |
Heading | 10 | Earl.APP |
Documentation
Definition
This date is the earliest start date for the Adoption Pay Period (APP). The start date of the APP depends on when the employee stops work.
The earliest date that an employee can begin the Adoption Pay Period is 14 days before the date the child is expected to be placed. However, the employee can work up until the placement date of the child, if so desired.
The system therefore calculates the Adoption Pay Period to start at the earliest 14 days before the expected date of placement of the child.
Use
Dependencies
You should enter, when appropriate, the date when the employee actually begins the Adoption Pay Period in the Actual start of APP field.
History
Last changed by/on | SAP | 20030327 |
SAP Release Created in | 470 |