SAP ABAP Data Element P02_CQTEI (WhT partial period invoice variant)
Hierarchy
SAP_HRCCH (Software Component) Sub component SAP_HRCCH of SAP_HR
   PA-PA-CH (Application Component) Switzerland
     PB02 (Package) HR Master Data: Switzerland
Basic Data
Data Element P02_CQTEI
Short Description WhT partial period invoice variant  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type P02_CQTEI    
Data Type CHAR   Character String 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 WhTPrtPerV 
Medium 15 WhTPrtPerdVar 
Long 20 WhTPartPeriodVariant 
Heading QHTPV 
Documentation

Definition

Withholding Tax: Factored Calculation Variant

To determine the correct withholding tax bracket in case of entry/leaving during the period, it is necessary to calculate the amount that the employee had earned if he or she had been employed during the whole period.

The factored calculation variant controls how the time-dependent wage, for example, the gross wage, is to be projected for an entire period.

The meaning of the values is demonstrated through the example of an entry on 01/16:

  • 30: Whole period with 30 days, factored period with actual number of days

    A whole period is always calculated with 30 days. The number of days in a factored period are calculated using the formula 30 - day of entry + 1.

    For this example, the formula results in the following: Whole period: 30 days, factored period: 15 .

  • 31: Whole period and factored period with real calendar days

    The days of a whole period and the days of a factored period are counted according to the calendar.

    For example, the result from the factored calculation variant: Whole period 31 days, factored period: 16 days.

  • 3A: Whole period with 30 days, factored period with actual days

    A whole period is always calculated with 30 days. The days of a factored period are counted according the calendar.

    The calculation variant from the factored period

    yields the following results: Whole period: 30 days, factored period: 16 days.

History
Last changed by/on SAP  19950401 
SAP Release Created in