SAP ABAP Data Element OPLKZ (With no MRP)
Hierarchy
BBPCRM (Software Component) BBPCRM
   PP-MP-DEM (Application Component) Demand Management
     MDPB (Package) Application development R/3 purchasing
Basic Data
Data Element OPLKZ
Short Description With no MRP  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR1    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 W/o MRP 
Medium 18 Without MRP 
Long 20 Without MRP 
Heading W/o MRP 
Documentation

Definition

You use this indicator to determine that the planned independent requirements are only consumed and are not planned in net requirements planning.

This means that the sales orders or customer requirements consume planned independent requirements and the requirements quantities do not lead to a stocking of the components.

This can make sense in characteristics planning if planned independent requirements are used to stock at assembly level.

History
Last changed by/on SAP  19960404 
SAP Release Created in