SAP ABAP Data Element OK_DTKEY (Saving the Cost Estimate)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ1 (Package) Customizing for Product Costing
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ1 (Package) Customizing for Product Costing
Basic Data
Data Element | OK_DTKEY |
Short Description | Saving the Cost Estimate |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Add Date |
Medium | 15 | Add Date to Key |
Long | 20 | Add Date to Key |
Heading | 0 |
Documentation
Definition
Indicator that controls whether the date forms part of the key when the cost estimate is saved.
Use
You have the following options:
- Save cost estimate without date
- Include key date (Costing Date From) in the key when the cost estimate is saved. Cost estimates are then saved with the current date (in the calendar year) in the key.
- Include period start in the key when the cost estimate is saved. Cost estimates are then saved with the period start (except in non-calendar fiscal year) in the key.
Procedure
Set the indicator as required.
Examples
Dependencies
Standard cost estimates must be saved with with period start.
If a cost estimate is saved without date, the results of the previous cost estimate are overwritten by new cost estimates.
History
Last changed by/on | SAP | 19971002 |
SAP Release Created in |