SAP ABAP Data Element OGRENZ (Upper Limit for Schedule Records)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-BF-PS (Application Component) Portioning and scheduling
⤷ EE15 (Package) IS-U: Scheduling
⤷ IS-U-BF-PS (Application Component) Portioning and scheduling
⤷ EE15 (Package) IS-U: Scheduling
Basic Data
Data Element | OGRENZ |
Short Description | Upper Limit for Schedule Records |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC3 | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Upp.Lim.SR |
Medium | 15 | UpperLimit f SR |
Long | 20 | Upper Limit for SR |
Heading | 3 | UL |
Documentation
Definition
Upper limit, in years, for generating schedule records.
Use
In this field, you enter the maximum number of years in advance that schedule records can be generated.
The default value is 7 years.
If you exceed the value entered here when generating schedule records, processing is terminated and the system issues an error message.
Dependencies
Example
Upper limit: 5 years
Current date: January 1st 2003
Create schedule records until: 2008
You want to generate schedule records for 5 years in advance.
Caution:
If you increase the generation period (for example to 2009), you exceed the upper limit: Processing is terminated and an error message is issued.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 472 |