SAP ABAP Data Element OFFS_MONTH (Start day for time fence for monthly period split)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-CRP-LVL (Application Component) Capacity Leveling
⤷ CY03 (Package) R/3 Appl. Dev.: Control Station Resource Planning (SFC)
⤷ PP-CRP-LVL (Application Component) Capacity Leveling
⤷ CY03 (Package) R/3 Appl. Dev.: Control Station Resource Planning (SFC)
Basic Data
Data Element | OFFS_MONTH |
Short Description | Start day for time fence for monthly period split |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | OFFS_MONTH | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TimeFncStt |
Medium | 15 | Strt time fence |
Long | 20 | Start day time fence |
Heading | 0 |
Documentation
Definition
Day when the time fence appears in the monthly split.
Example
- You specify 01 as the start day of the time fence.
The time fence line always appears on the first of the month.
- You specify "First day of planning section" as the start day of the time fence. Your planning section starts on the 15th of the month.
The time fence line always appears on the 15th of the month.
History
Last changed by/on | SAP | 19970827 |
SAP Release Created in |