SAP ABAP Data Element OFFS_MONTH (Start day for time fence for monthly period split)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-CRP-LVL (Application Component) Capacity Leveling
     CY03 (Package) R/3 Appl. Dev.: Control Station Resource Planning (SFC)
Basic Data
Data Element OFFS_MONTH
Short Description Start day for time fence for monthly period split  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type OFFS_MONTH    
Data Type CHAR   Character String 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 TimeFncStt 
Medium 15 Strt time fence 
Long 20 Start day time fence 
Heading  
Documentation

Definition

Day when the time fence appears in the monthly split.

Example

  • You specify 01 as the start day of the time fence.

    The time fence line always appears on the first of the month.

  • You specify "First day of planning section" as the start day of the time fence. Your planning section starts on the 15th of the month.

    The time fence line always appears on the 15th of the month.

History
Last changed by/on SAP  19970827 
SAP Release Created in