SAP ABAP Data Element OFFS_DAY (Start time time fence for daily period split)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-CRP-LVL (Application Component) Capacity Leveling
⤷ CY03 (Package) R/3 Appl. Dev.: Control Station Resource Planning (SFC)
⤷ PP-CRP-LVL (Application Component) Capacity Leveling
⤷ CY03 (Package) R/3 Appl. Dev.: Control Station Resource Planning (SFC)
Basic Data
Data Element | OFFS_DAY |
Short Description | Start time time fence for daily period split |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TIMES | |
Data Type | TIMS | Time field (hhmmss), stored as char(6) |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TimeFncStt |
Medium | 15 | Strt time fence |
Long | 20 | Start day time fence |
Heading | 0 |
Documentation
Definition
Time when the time fence appears in the daily period split.
Example
- You specify 08:30:00 as the start time for the time fence.
The time fence line appears at 8:30 on the relevant day.
- You do not specify a start time for the time fence, that is this field remains empty. Your planning section starts at 12:40 on a particular day.
The time fence line always appears at 12:40 on the given day.
History
Last changed by/on | SAP | 19970827 |
SAP Release Created in |