SAP ABAP Data Element NUMBER_OF_WEEKS (Number of weekly periods)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
Basic Data
Data Element | NUMBER_OF_WEEKS |
Short Description | Number of weekly periods |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC3 | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Weeks |
Medium | 15 | Number of weeks |
Long | 20 | Number of weeks |
Heading | 25 | Number of weekly periods |
Documentation
Definition
Determines the number of weekly periods for the user-defined period split.
- Planning table
In the planning table, after the columns of daily periods, the system displays separate columns for the number of weekly periods you specify.
- Line load evaluation in Sequencing
In the table, after the rows of daily periods, the system displays separate rows for the number of weeks you specify.
Here, the weekly periods always last from Monday to Sunday.
Use
These entries provide you with a great degree of flexibility in adjusting the periods for the planning table and for Sequencing to suit your requirements.
If you want to retain the settings for future sessions, choose Save user settings.
Dependencies
In the sequence schedule, you only change the evaluation periods for the line load. The planning periods do not change.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in |