SAP ABAP Data Element NEWTASK (Data determined in parallel in a new task)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   LE-TRA-IN (Application Component) Interfaces
     VVTR (Package) Express Delivery Company Interface & Tracking
Basic Data
Data Element NEWTASK
Short Description Data determined in parallel in a new task  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Parallel 
Medium 15 Parallel task 
Long 22 Parallel processing 
Heading 10 Parallel 
Documentation

Definition

This indicator dictates whether the determination routine for the express delivery company data-fields should be carried out in a parallel task during delivery update. This is helpful if Remote Function Calls (RFCs) occur during the determination process, since RFCs can sometimes lock up the system. The system only waits a certain length of time for the parallel task to be processed. If this time limit is exceeded, the system makes an entry in the incompletion log.

Depending on the infrastructure of your system, parallel processing could accelerate processing.

Please note:
Parallel processing increases the number of processes in the system. If bottlenecks occur in the system, the parallel task may not get a chance at processing or may not be able to be started.

History
Last changed by/on SAP  19991014 
SAP Release Created in