SAP ABAP Data Element MOVE_OVERLAPPING (Move schedule records to previous/next month)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BF-PS (Application Component) Portioning and scheduling
⤷
EE15 (Package) IS-U: Scheduling

⤷

⤷

Basic Data
Data Element | MOVE_OVERLAPPING |
Short Description | Move schedule records to previous/next month |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KENNZX | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 42 | Move sched. recs to previous/next month |
Documentation
Use
Moves schedule records to the preceeding or next month when this is required by dynamic scheduling.
Example
You have defined a 19-day cycle, but the month of January has 20 working days. You have the following options:
- If you select this field, the scheduling record of the first working day in February will be shifted to the last working day in January.
- If you do not select this field, no scheduling record will be scheduled for the last working day in January. The result is a so-called "buffer day" at the end of January.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |