Hierarchy
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_GENERAL (Package) PP on HANA: General Functions
Basic Data
Data Element | MINIMUMLOTSIZERATIOINPERCENT |
Short Description | Minimum Lot Size Percentage |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MINIMUMLOTSIZERATIOINPERCENT | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 5 | |
Decimal Places | 2 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | LS Percent |
Medium | 15 | LS Percentage |
Long | 20 | Min. Lot Size Pctge |
Heading | 19 | Min. Lot Size Pctge |
Documentation
Definition
Specifies the percentage of the minimum lot size quantity that is used as the material shortage threshold.
Use
The entry you make here influences when the system displays a material shortage.
Dependencies
You have to enter a value in this field, if you have chosen the threshold type Avail.Qty Below Percentage of Minimum Lot Size for your material shortage definition.
Example
The system determines a minimum lot size of 30 pc for a material. (The minimum lot size is the maximum value of the rounding value, fixed lot size, and the minimum lot size.)
You enter 50 in the Min.Lot Size Pctge field.
In this case, the system displays a material shortage for a material when the available quantity is negative and falls below the percentage of the minimum lot size quantity. That is -15 pc.
History
Last changed by/on | SAP | 20140121 |
SAP Release Created in | 618 |