SAP ABAP Data Element MIN_GUTSCH (IS-M: De Minimis Limitation for Contract Credit Memo)
Hierarchy
☛
IS-M (Software Component) SAP MEDIA
⤷ IS-M (Application Component) SAP Media
⤷ JAS (Package) Application development R/3 Publishing Advertising System***
⤷ IS-M (Application Component) SAP Media
⤷ JAS (Package) Application development R/3 Publishing Advertising System***
Basic Data
Data Element | MIN_GUTSCH |
Short Description | IS-M: De Minimis Limitation for Contract Credit Memo |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ISPBETR07 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 7 | |
Decimal Places | 2 | |
Output Length | 9 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | CONTRACT_CREDIT_DEMINLIM | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | DeM.Crd.me |
Medium | 20 | De min.credit memo |
Long | 40 | De minimis limitation for cntrt crd.memo |
Heading | 9 | DeMCredMe |
Documentation
Definition
If the credit memo amount of a contract settlement falls below the de minimis limitation in the sales area currency, then a billing block is set due to a trivial amount
Example
If the credit memo (difference between planned and actual amount) for contract settlement is less than the de minimis limitation, a billing block will be set due to this trivial amount. The planned amount from the blocked settlement will then be used for the next settlement, and if the difference between this and the new actual amount falls above the de minimis limitation, no billing block will be set. This means that the customer will receive one larger credit memo, rather than two smaller ones during billing.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |