SAP ABAP Data Element MILL_PREF_UCCHA_SEL (Requirement: Include/Exclude Original Batch)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
IS-MP-MM (Application Component) Materials Management (MM) enhancements
⤷
MILL_MM (Package) IS: Mill Products - Materials Management
⤷
⤷
Basic Data
| Data Element | MILL_PREF_UCCHA_SEL |
| Short Description | Requirement: Include/Exclude Original Batch |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | MILL_PREF_UCCHA_SEL | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | OB I/E |
| Medium | 15 | OB INCL/EXCL |
| Long | 38 | Include/Exclude Original Batch |
| Heading | 0 |
Documentation
Definition
Controls how the system takes account of the selected original batch during batch determination.
Use
It is possible to specify a particular original batch in batch determination, to give an original batch preference, or exclude it from the selection.
- Specify:
Only the batches that belong to the specified batch are considered. No other batches are ready for input.
- Give preference:
If sufficient stock is available for several original batches in batch determination, this batch is given prference. In the quantity proposal, the batches of his original batche are allocated quantities.
- Exclude:
No split quantities are set for the batches that belong to this original batch. The batches in question are not ready for input.
History
| Last changed by/on | SAP | 20050301 |
| SAP Release Created in |