SAP ABAP Data Element ME_FIXMG (Delivery Date and Quantity Fixed)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ BBP_APPLICATION (Package) Structure Package EBP
⤷ ME (Package) Application development R/3 Purchasing
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ BBP_APPLICATION (Package) Structure Package EBP
⤷ ME (Package) Application development R/3 Purchasing
Basic Data
Data Element | ME_FIXMG |
Short Description | Delivery Date and Quantity Fixed |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ME_FIXMG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | DATE_QTY_FIXED | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Fixed |
Medium | 15 | Fixed Date |
Long | 20 | Fixed Date and Qty |
Heading | 3 | Fix |
Documentation
Definition
Indicates whether you want to fix the delivery dates and quantities that are confirmed after an availability check.
Use
If the supplying plant cannot confirm the desired delivery date or the desired delivery quantity in total, confirmed dates and quantities differ from the desired dates and quantities. With this checkbox you can control whether materials planning is based on the confirmation schedule lines or on the desired schedule lines.
- If you select the checkbox, the goods are made available on the date confirmed by the availability check in the supplying plant. The system only generates confirmation schedule lines for the requirement quantities confirmed by the ATP check. In the case of underconfirmation, desired and confirmed quantities deviate from one another. You cannot reschedule the corresponding purchase order item.
- If you do not select the checkbox, materials planning is performed according to your Customizing settings. In the Customizing activity Assign Delivery Type and Checking Rule, you can use the ATP Conf. MRP field to indicate whether materials planning is based on desired or confirmed schedule lines. You do this for a combination of document type, supplying plant, and checking rules. If you select the checkbox in Customizing, confirmation schedule lines are still taken into account in the case of rescheduling.
Procedure
Note
If you select this checkbox in a stock transport order, the system ignores the Customizing settings described above for all schedule lines of the purchase order item in question.
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 606 |