SAP ABAP Data Element ME_FIXMG (Delivery Date and Quantity Fixed)
Hierarchy
BBPCRM (Software Component) BBPCRM
   SRM-EBP (Application Component) Enterprise Buyer
     BBP_APPLICATION (Package) Structure Package EBP
       ME (Package) Application development R/3 Purchasing
Basic Data
Data Element ME_FIXMG
Short Description Delivery Date and Quantity Fixed  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type ME_FIXMG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name DATE_QTY_FIXED   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Fixed 
Medium 15 Fixed Date 
Long 20 Fixed Date and Qty 
Heading Fix 
Documentation

Definition

Indicates whether you want to fix the delivery dates and quantities that are confirmed after an availability check.

Use

If the supplying plant cannot confirm the desired delivery date or the desired delivery quantity in total, confirmed dates and quantities differ from the desired dates and quantities. With this checkbox you can control whether materials planning is based on the confirmation schedule lines or on the desired schedule lines.

  • If you select the checkbox, the goods are made available on the date confirmed by the availability check in the supplying plant. The system only generates confirmation schedule lines for the requirement quantities confirmed by the ATP check. In the case of underconfirmation, desired and confirmed quantities deviate from one another. You cannot reschedule the corresponding purchase order item.
  • If you do not select the checkbox, materials planning is performed according to your Customizing settings. In the Customizing activity Assign Delivery Type and Checking Rule, you can use the ATP Conf. MRP field to indicate whether materials planning is based on desired or confirmed schedule lines. You do this for a combination of document type, supplying plant, and checking rules. If you select the checkbox in Customizing, confirmation schedule lines are still taken into account in the case of rescheduling.

Procedure

Note

If you select this checkbox in a stock transport order, the system ignores the Customizing settings described above for all schedule lines of the purchase order item in question.

History
Last changed by/on SAP  20130529 
SAP Release Created in 606