Hierarchy

⤷

⤷

Basic Data
Data Element | MDST_SYNC_TEST_RUN |
Short Description | Test Run Indicator |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 5 | Test |
Medium | 10 | Test Run |
Long | 15 | Test Run |
Heading | 10 | Test Run |
Documentation
Definition
Option for simulating data transfer for synchronization objects.
Use
You can simulate data transfer to the system for some synchronization objects (source and target object). If you want to simulate the initial synchronization (InitialLoad) in the system, set the Test Run indicator. The system then carries out a test run to check whether all the data can be transferred to the target database without errors. You can use the Postprocessing Office to correct any errors that arise during the test run. To synchronize the data, you then have to deselect the indicator and restart the synchronization run.
Important
Some synchronization objects do not allow you to perform a test run. In this case, the test run option is not active. When you synchronize these objects, the system transfers the data to the database immediately.
Dependencies
Example
History
Last changed by/on | SAP | 20050219 |
SAP Release Created in | 600 |