SAP ABAP Data Element MDRD_LEVEL_M (Level for Determining Supplied MRP Areas)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
Basic Data
Data Element | MDRD_LEVEL_M |
Short Description | Level for Determining Supplied MRP Areas |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MDRD_LEVEL | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Level |
Medium | 20 | MRP Areas Level |
Long | 40 | Level for Determining MRP Areas |
Heading | 4 | Lvl |
Documentation
Definition
You can use this field to control the level on which the supplied plants are determined.
The following levels are possible:
- (Issuing) plant
- Material group
- Material
Not all of the possible checks (depending on the method selected) can be performed for all of the selected levels.
- Determination at plant level makes sense if the quantity of supplied plants is the same for all the materials in the issuing plant that are relevant for the forecast scenario.
- Determination at material group level makes sense if the quantity of supplied plants is the same for all materials in the isssuing plant within one material group that are relevant for the forecast scenario.
- Determination at material level makes sense if the quantity of the supplied plants may be different for all the materials in the issuing plant that are relevant for the forecast scenario.
The more specific the level chosen for determination, the longer determination takes and the more runtime-intensive it is, therefore the more memory space required. You should therefore select the least detailed level possible.
History
Last changed by/on | SAP | 20050428 |
SAP Release Created in | 600 |