SAP ABAP Data Element MDRD_CHK_WRF3 (Delivery Relationship: Supplying Plant Check)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
Basic Data
Data Element | MDRD_CHK_WRF3 |
Short Description | Delivery Relationship: Supplying Plant Check |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MDRD_CHK_WRF3 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sup.Plants |
Medium | 15 | Supply Plants |
Long | 20 | Supply Plants Check |
Heading | 6 | SupPln |
Documentation
Definition
You can use this indicator to determine whether issuing plants are taken into consideration when determining the supplied plants.
The following options are available:
- Do not check issuing plants
- Only consider issuing plants that are not assigned a priority
- Only consider issuing plants that are not assigned a priority or are priority 1
- Consider all issuing plants
- Consider all issuing plants and check the priority using the user exit for issuing plant determination
- Consider all issuing plants and check the priority using the listing check and the user exit for issuing plant determination
As the issuing plant check can be very runtime-intensive, you should only set the check to the extent that it is actually relevant to supply source determination.
To determine the supplied plants using the recipient determination method, either the issuing plants check or the source list entries check must be set. Determining supplied plants at plant or material group level requires the check of issuing plants, however the priority check is not possible in this case.
History
Last changed by/on | SAP | 20050428 |
SAP Release Created in | 600 |