SAP ABAP Data Element MCEXC (Set indicator to include current period in period to analyze)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
LO-LIS-REP (Application Component) Reporting
⤷
MCR (Package) R/3 application development: Logistics Info Sys. (Reporting)
⤷
⤷
Basic Data
| Data Element | MCEXC |
| Short Description | Set indicator to include current period in period to analyze |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | X | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Curr. per. |
| Medium | 15 | Current period |
| Long | 20 | With current period |
| Heading | 1 | C |
Documentation
Definition
Causes the current period to be included in the selection time period.
Supplementary Documentation - MCEXC 0001
Use
Use of a default value facilitates data entry.
Examples
Suppose that the data is updated at monthly intervals.
You perform an evaluation on March 15. If the indicator has been set, the month of March is automatically proposed on the selection screen as the end of the period to analyze.
Dependencies
History
| Last changed by/on | SAP | 19960423 |
| SAP Release Created in |