SAP ABAP Data Element MBDIF (Deferment Period for Material Provision in Days)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VZ (Package) Application development R/3 RV central functions
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VZ (Package) Application development R/3 RV central functions
Basic Data
Data Element | MBDIF |
Short Description | Deferment Period for Material Provision in Days |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MBDIF | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Def.period |
Medium | 15 | Delay |
Long | 20 | Provision delay |
Heading | 3 | RP |
Documentation
Definition
You can enter here a period of time in days by which an order confirmation is to be postponed. This postponement applies to all document items.
Example
To check the creditworthiness of your customers, you need a processing period of 10 days. If you specify a corresponding postponement period, the following situations may occur:
Starting from the current date 10/01, the system may determine 10/06 as the material availability date. Since the material availability date falls within the postponement period, the confirmation date is postponed to 10/11 in this case.
If the system determines, for example, 10/15 as the material availability date, the confirmation date would not be postponed.